Guardian Under Construction/20466.tifPrevious | Home | Next |
|
Neg. No. 20466. S. Cable Tube. Fixing mesh and canvas
to wall of tunnel to divert water. The crown of this section, adjacent
to Site 7A T.C. is dry and does not require sika treatment. [11.8.55]
|